Skip links

Our Projects

Our experience covers the complete spectrum from large construction projects to trade-specific remodels and everything in-between.

Case study
Bath & Body Works

The Bath & Body Works is a modification & renovation of an existing retail store for a new one having a single floor, and a gross area of 5,062 SF. Trades selected: Full GC Total estimated cost: $1,028,686

Case study
Walmart Ocala

The Walmart Ocala is a new ground-up construction of retail store construction. Trades selected: Concrete and Masonry Total estimated cost: $381,590

Case study
The Skechers Store, Mesquite

The Skechers Store, Mesquite is tenant improvements of an existing space for a retail store for shoes, clothing and accessories. The proposed gross floor area is 16,030 SF approx. Trades selected (SOW): Demolition, Carpentry, Framing and Drywall, Flooring, Painting, & Electrical Total estimated cost: $689,188

Case study
Brandlin Residence

The Brandlin Residence is an addition/alteration to the existing single-family residence, with a gross area of 4772 SF. Trades selected: All construction trades - Everything (Full G.C. scope) Total estimated cost: $1,016,627

Case study
Joey Restaurant, Northpark Center

The Joey Restaurant, Northpark Center is an addition/alteration (tenant improvements) of the existing structure. Approximately gross area is 11,587 sq. ft. Trades selected: Structural Steel (metal framing: excluding light gauge) Total estimated cost: $178,018

Case study
Dutch Bros Coffee

The Dutch Bros Coffee, Midland TX 79705 is ground-up construction of a new coffee shop, with a gross area of 26,721 SF. Trades selected: All construction trades - Everything (Full G.C. scope) Total estimated cost: $1,798,875

Case study
Herculaneum HS Gym

The Herculaneum H/S Gym, MO 63048 involves a new gymnasium addition (area A) and interior renovations in the existing Performing Arts Center(area B). Building Area: 18,340 sq ft (Gym Addition), 2 Stories, 40' Height Trades selected (SOW): HVAC & Plumbing material takeoff with labour hours. Total estimated Hours: 10,265 Hours

Case study
Improve Inpatient Privacy

The Improve Inpatient Privacy is renovation of the fifth floor (5B) at Durham VA Medical Center. The proposed gross floor area is 8,380 SF approx. Trades selected (SOW): Paint Total estimated cost: $68,377

Case study
Marshall Residence

This is the construction of a new 4-level, single-family residence, having a gross area of 3,780 SF. Trades selected: All construction trades - Everything (Full G.C.) Total estimated cost: $1,255,484

Case study
New Single Family Residence

The New Single Family Residence is a new ground-up construction project of a single-story residence. The proposed gross floor area is 3,755 SF approximately. Trades selected: Framing, Openings, Roofing & Siding Total estimated cost: $282,621.

Case study
WYRD Edgewater

The WYRD Edgewater is a tenant finish-out interior renovation/repair of an existing suite, with a gross area of 1,885 SF. Trades selected: Electrical (Demo, Lighting, Power, Fire alarm) Total estimated cost: $35,848

Case study
The Private Suite At Mia

This is the construction of a new 2-story, residential suite with a basement, having a gross area of 47,088 SF approximately. Trades selected: Plumbing Total estimated cost: $719,225

This website uses cookies to improve your web experience.